60 Days Of Bikerowave 3.0

By Alex Thompson

Bikerowave moved into it’s new location on August 1st.  We left Santa Monica, and a back alley semi-industrial area, and moved into prime real estate on Venice Blvd in Mar Vista.  In the process I took 2800 photos, documenting the first 60 days at our new location.  You can check out the keepers in the “Bikerowave 3.0, the first 60 days” Flickr gallery.  Here’s a few:

Volunteers and Bikerowave cheer the opening of Bikerowave 3.0.



Steve Mattson, General Manager of Bikerowave, signs our lease

The ceiling of Bikerowave 3.0, before we painted over it.

There was a lot of demo and renovation to do. Here Eric attacks tiling.

Kwang strikes a menacing figure as he and Paul demo some sheet rock.

Steven rides along with Larsen on his tall bike, on a break from packing up Bikerowave Version 2 to move to 3.0

Paused

David pauses for a second while moving Bikerowave from 2.6 to 3.0

Little bikes

Little bikes sprouted up near Bikerowave 3.0 almost immediately.

Outlining in Darkness

Justin sketches out a mural at Bikerowave 3.0, in darkness (long exposure.)

Our new hood

Matt comes to join the opening day party in our new hood.

12255

Our new address number is masked up for repainting - 12255 Venice Blvd.

Share and tweet!

Twitter Digg Delicious Stumbleupon Technorati Facebook Email

Trackbacks/Pingbacks

  1. I’d know that look anywhere « BikingInLA - January 15th, 2010

    [...] and a motorized red light runner, and sticks up for his Ballona, assaults and all. Photos from the first 60 days of the new Bikerowave. LACBC looks back on a successful 2009, and looks forward to 2010. The [...]

Leave a Reply

Bear